Yusuf E. shared this 24-question build with 4 conditional rules already wired up. Test it below, then take a copy.

A ready-to-use construction form for small teams who need a reliable intake process: 24 questions, 2 pages, 4 conditional rules.

Shared by
Yusuf E. · Recruitment partner
Questions
24
Replies
17
Copies taken
882
See the library version

change order request form, construction variation form, site change order online, construction change request form, variation order approval form, change order request, change order request forms, change order request template, online change order request, change, changes, order, orders, request, requests, number, phase, changed, drawings, construction form, site form, tender form, snag list, site induction, variation order, subcontractor form, handover form, building form, job site report, change order request example, shared change order request

Live preview and test console

This is the real form. Answer it to test the flow — nothing is sent or stored.

Page 1 of 2 — The change

Which job, phase and drawing?

Is a revised drawing available?
How was the change instructed?

This template runs as a straight sequence — no branching rules.

Works for you? Take Yusuf E.'s copy into your own workspace — questions, rules and settings included.

Who this template is for

Change Order Request is built for small teams who need a reliable intake process who need to collect the same complete information from everyone.

  • Small teams who need a reliable intake process working in construction.
  • Teams who need to collect the same complete information from everyone without writing code or paying for a custom build.
  • Anyone replacing chasing missing details over email with one structured record per enquiry.
  • Respondents are the people you send it to — the form asks them 24 questions across 2 screens.

Why this form is useful

It removes the cost of chasing missing details over email and turns each submission into a record your team can act on immediately.

  • 14 questions are required, so submissions arrive complete instead of needing a follow-up email.
  • It accepts a document or photo upload as evidence.
  • It records a signature you can keep as proof of agreement.
  • It pins the request to a specific date.
  • It captures a numeric value you can filter and sort on.
  • Conditional logic hides 4 questions until they are relevant — shorter forms convert better than long ones.
  • Splitting the form across 2 pages keeps each screen short and shows respondents how much is left.
  • Every response is stored, searchable and exportable, so nothing depends on one person's inbox.

How to use this template

From copy to live form is a few minutes of work, and every step is reversible.

  1. 1Press “Use this template” — a fresh copy of Change Order Request lands in your workspace, ready to edit.
  2. 2Rename or delete any question, and change what is required. Nothing here is fixed.
  3. 3Open Notifications and add the email addresses that should be alerted on each submission; add an auto-reply to the respondent if the form collects an email address.
  4. 4Check the upload limits on the file question so respondents can attach what you actually need.
  5. 5Publish it, then either share the link directly or paste the embed snippet into your site — the embedded form resizes to fit and loads no marketing or advertising trackers.
  6. 6Watch responses land in Submissions, where you can filter, label and export them to CSV or PDF.

Logic and conditions blueprint

Exactly how this form behaves as it is answered — 4 conditional rules ship with it.

  • Features conditional validation: if “Does this change affect the completion date?” is Yes, “Extra days needed” becomes mandatory before the form can be sent.
  • Features conditional validation: if “Has any of this work already started?” is Yes, “Who instructed the early start, and when” becomes mandatory before the form can be sent.
  • Features conditional validation: if “How was the change instructed?” is Verbally on site, “Who gave the instruction” becomes mandatory before the form can be sent.
  • Features conditional validation: if “Is a revised drawing available?” is Yes, “Revised drawing number and revision” becomes mandatory before the form can be sent.
  • All 4 rules are editable in the Logic tab, and the built-in checker warns about rules that contradict each other.

What this form asks

Page 1 — The change

  • Project namerequired
  • Job numberrequired
  • Phase or arearequired
  • Trade affectedrequired
  • Cost code to chargerequired
  • What is changing, and whyrequired
  • Is a revised drawing available?required
  • Revised drawing number and revision
  • How was the change instructed?required
  • Who gave the instruction
  • Date instructedrequired

Page 2 — Cost and time

  • Labour hours
  • Labour rate per hour
  • Materials cost
  • Plant and equipment cost
  • Subcontractor cost
  • Total change valuerequired
  • Does this change affect the completion date?required
  • Extra days needed
  • Has any of this work already started?required
  • Who instructed the early start, and when
  • Attach markup, photos or supplier quote
  • Approved to proceedrequired
  • Approval daterequired

Conditional logic in this build

  • When “Does this change affect the completion date?” is Yes, require “Extra days needed”.
  • When “Has any of this work already started?” is Yes, require “Who instructed the early start, and when”.
  • When “How was the change instructed?” is Verbally on site, require “Who gave the instruction”.
  • When “Is a revised drawing available?” is Yes, require “Revised drawing number and revision”.

Questions about this shared form

How does this differ from a contract change request?

The contract version amends an agreement between two companies. This one lives on site: job number, phase, trade, cost code and drawing revision, priced in labour hours.

And a scope change request?

That is a project-management form about deliverables. A change order is construction work with a value and a programme effect, approved before or during the work.

Work already started — should we still raise one?

Yes, and the form asks who instructed the early start rather than hiding it. An unpriced started change is the hardest kind to recover.

Who signs it?

Whoever holds financial authority for that job. Set the routing by value so nothing waits on one person for a small change.

Is the Change Order Request template free to use?

Yes. You can preview and test Change Order Request on this page without an account, and take a copy into your own HelloForms workspace on the free plan. There is nothing to install and no card required to publish it.

What does the Change Order Request template ask for?

It asks 24 questions across 2 pages, 14 of which are required. Every question is listed in full further down this page, and each one can be renamed, reordered, made optional or deleted after you copy the template.

Can I edit the Change Order Request form after copying it?

Yes — the copy is entirely yours. Change wording, add or remove questions, switch between the classic layout, restyle it to match your brand, and set who gets notified on each submission.

How does the conditional logic in this construction form work?

4 conditional rules ship with the template: Features conditional validation: if “Does this change affect the completion date?” is Yes, “Extra days needed” becomes mandatory before the form can be sent. Features conditional validation: if “Has any of this work already started?” is Yes, “Who instructed the early start, and when” becomes mandatory before the form can be sent. Features conditional validation: if “How was the change instructed?” is Verbally on site, “Who gave the instruction” becomes mandatory before the form can be sent. All rules are editable in the Logic tab.

Where do responses to the Change Order Request form go?

Submissions land in your workspace under Submissions, where you can search, filter, label and export them to CSV or PDF. You can also email a notification to your team on every submission and send the respondent an auto-reply.

Can I embed the Change Order Request form on my own website?

Yes. Publish the form and paste the embed snippet into any page or share the direct link. The embedded form resizes to fit its container and loads no advertising or marketing trackers inside the iframe.

Can respondents upload files?

Yes. This template includes a file upload question, so respondents can attach documents or photos with their answers. You can adjust the accepted file types and size limits on that question.

Is the signature on this form legally usable?

The template captures a drawn signature and stores it with the submission, along with the timestamp, so you keep evidence of who agreed and when. Whether that is sufficient depends on your jurisdiction and the agreement itself.