Subcontractor Bid Form
Three-page trade package bid: the package and drawings priced, rates and totals, plus labour, supervision, insurance and safety documents on site.
Tenders, site inductions, snag lists, variations and handover sign-off.
5 free templates — preview any of them without an account, then customise every question, colour and layout.
Showing 1–5 of 5 templates · sorted by best match
Three-page trade package bid: the package and drawings priced, rates and totals, plus labour, supervision, insurance and safety documents on site.
Site query to the design team: the drawing and detail in question, what is unclear, the work it holds up, a proposed answer and the date needed by.
Three-page bid submission for a build package: the tender being answered, priced scope with a cost breakdown, programme, exclusions and validity.
A crane shift handover must preserve the machine identity, site conditions and defects. This record supports the approved lifting plan rather than inventing generic operating limits. Refer defects to the lifting supervisor; no completed checklist overrides a lift plan or examination requirement.
Portable ladders move between vans and jobs, making damaged feet or rungs easy to miss. Identify the ladder and record condition before deciding whether it can remain in circulation. Quarantine damaged ladders; suitability for a task still requires the work-at-height assessment.
Teams browsing this collection often start here too.