Change Order Request
Site change order tied to a job number, phase and cost code: what changed on the drawings, who asked, the cost and time effect, and approval to proceed.
Tenders, site inductions, snag lists, variations and handover sign-off.
15 free templates — preview any of them without an account, then customise every question, colour and layout.
Showing 1–15 of 15 templates · sorted by best match
Site change order tied to a job number, phase and cost code: what changed on the drawings, who asked, the cost and time effect, and approval to proceed.
Payment-stage waiver for a construction job: job number and package, the amount and period covered, whether it is partial or final, and signed release.
One-screen delivery receipt for site: job number and cost code, supplier and order, what arrived, condition, shortages or damage, and who signed for it.
One-screen snag entry for a walkaround: job number, unit and room, the defect and trade responsible, priority, photo and who fixes it by when.
Site query to the design team: the drawing and detail in question, what is unclear, the work it holds up, a proposed answer and the date needed by.
Three-page trade package bid: the package and drawings priced, rates and totals, plus labour, supervision, insurance and safety documents on site.
Construction completion certificate: job number and contract works, the completion date, outstanding snags, documents handed over and signatures.
Three-page bid submission for a build package: the tender being answered, priced scope with a cost breakdown, programme, exclusions and validity.
End-of-day site record: crews and hours on the job number, work completed by area, weather and delays, deliveries, visitors and anything raised.
One-screen record of a site safety briefing: topic, job number, who delivered it, everyone who attended and the questions raised on the spot.
A crane shift handover must preserve the machine identity, site conditions and defects. This record supports the approved lifting plan rather than inventing generic operating limits. Refer defects to the lifting supervisor; no completed checklist overrides a lift plan or examination requirement.
Portable ladders move between vans and jobs, making damaged feet or rungs easy to miss. Identify the ladder and record condition before deciding whether it can remain in circulation. Quarantine damaged ladders; suitability for a task still requires the work-at-height assessment.
Scaffold conditions can change after alteration, weather or nearby work. Record the inspected configuration and access restrictions so the site team can act on specific defects. Only the competent person determines access under the site procedure; defects need documented correction.
Plant hire request for a live site: job number and cost code, what is needed and for which task, dates and access, operator, delivery and off-hire.
Three-page site safety walk: job number and phase, access, work at height, plant and electrical checks, welfare, plus findings with owners and dates.
Teams browsing this collection often start here too.